Schedule of Works
Definition
A schedule of works is a written, room-by-room or task-by-task list of everything that needs doing on a job. Unlike a bill of quantities it is description led rather than fully measured, so it suits refurbishment and smaller works. Each item is priced as a lump sum or with simple quantities. It tells everyone exactly what is in scope.
A schedule of works sets out the tasks in plain language, often grouped by room or area, for example strip out the bathroom, chase walls for new services, plaster and make good. It is ideal where drawings alone do not capture the work, such as alterations and repairs.
Contractors price each item, which gives the client a clear breakdown without the detail of a full measured bill. It works well on extensions, conversions and refurbishment where the scope is more about what to do than precise quantities.
Why it matters
A tight schedule of works stops the classic refurbishment argument over what was included. Everyone prices the same task list, so the client compares like with like and you protect yourself against scope creep and unpaid extras once work starts.
We write a clear, itemised schedule of works from your drawings and notes so refurbishment and alteration jobs can be priced without confusion.
Need this priced on a real job?
Send us your drawings and we'll turn them into a professional, branded estimate with a fixed fee and a turnaround time.
Upload Your Drawings